-rw-r--r--TeleMetrum/production.mdwn27
1 files changed, 24 insertions, 3 deletions
diff --git a/TeleMetrum/production.mdwn b/TeleMetrum/production.mdwn
index f706f30..cf1732e 100644
--- a/TeleMetrum/production.mdwn
+++ b/TeleMetrum/production.mdwn
@@ -12,6 +12,10 @@ ground. R17 replaced with short circuit, R18 removed.
Installed in Bdale's Vertical Assault. First unit to be flown on
19 April 2009, on a Cesaroni J335.
+Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
+2009.07.18 with a MAWD as backup. The first dual-deploy flight with a TM
+board in control of ejection charges!
+
## sn 2 ##
Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory
@@ -26,7 +30,8 @@ ascent was pretty but the rocket failed to deploy and lawn-darted. The battery
and screw terminal block connectors got more or less torn off, but the rest
of the board survived and good data was recovered from the flight.
-Repaired by Bdale, sent back to Keith on 7 July 2009.
+Repaired by Bdale, sent back to Keith on 7 July 2009. Keith reports the
+baro sensor (which is still original) is flakey and needs to be replaced.
## sn 3 ##
@@ -39,8 +44,8 @@ flown there.
Pulled and given to Keith to take home from Mayhem.
-Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not
-recovered. Now presumed lost.
+Lost in Keith's Nike which was never found after an apparently nominal flight
+in June 2009 at Brothers, Oregon.
## sn 4 ##
@@ -50,6 +55,9 @@ from each to ground.
Installed in Robert's Lil Nuke.
+Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
+both it and the electronics sled came out at apogee and were not recovered.
+
## sn 5 ##
Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial
@@ -64,3 +72,16 @@ Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
Keith's TeleDongle.
Keith added acrylic LED light pipes and a LiPo for use in RDF after flgith.
+
+## sn 7 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+## sn 8 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+