summaryrefslogtreecommitdiff
path: root/TeleScience
diff options
context:
space:
mode:
authorBdale Garbee <bdale@gag.com>2012-02-27 11:55:15 -0700
committerBdale Garbee <bdale@gag.com>2012-02-27 11:55:15 -0700
commit1e914a347f81a19a7dca500edf79af627f2617d1 (patch)
treec4f1534cd40598f9b0ac5aa58e1e5e154e77bb3d /TeleScience
parent5d4d13d2073c566d8b732eff1efb08248e7fe5a6 (diff)
time passes
Diffstat (limited to 'TeleScience')
-rw-r--r--TeleScience/index.mdwn8
1 files changed, 6 insertions, 2 deletions
diff --git a/TeleScience/index.mdwn b/TeleScience/index.mdwn
index 1e25ee1..d435a60 100644
--- a/TeleScience/index.mdwn
+++ b/TeleScience/index.mdwn
@@ -63,9 +63,13 @@ but no prototypes have been built yet.
## Future Plans ##
-3 prototypes have been built, of which 2 are installed in
+6 prototypes have been built, of which 2 were installed in
[2YikStik](http://www.gag.com/rockets/airframes/2YikStik/)
-which we hope to fly at LDRS 30 in early September 2011.
+and flown at LDRS 30 in early September 2011. Unfortunately, we experienced a
+mechanical failure in the airframe before going fast enough to get exciting
+data, but post-flight analysis suggested the TeleScience boards were working
+fine up until "the incident". A replacement airframe is under construction
+that we hope to fly at NCR's 2012 edition of Mile High Mayhem.
The thermistor conditioning circuits in the current design are very tightly
coupled to the particular model of EPCOS thermistor that we chose for 2YikStik.