diff options
| author | Bdale Garbee <bdale@gag.com> | 2009-07-06 01:11:18 -0600 |
|---|---|---|
| committer | Bdale Garbee <bdale@gag.com> | 2009-07-06 01:11:18 -0600 |
| commit | c30f415aa1031d1f155e0914ee648be028076f30 (patch) | |
| tree | f50191da3ee5f75e8f4474fb6f2e39ef84fcefe3 | |
| parent | faa1315b2b70aa6cce911096ea4c5dddf86b2a77 (diff) | |
update production log
| -rw-r--r-- | TeleMetrum/production.mdwn | 8 |
1 files changed, 5 insertions, 3 deletions
diff --git a/TeleMetrum/production.mdwn b/TeleMetrum/production.mdwn index 6c6a7d3..c8b3073 100644 --- a/TeleMetrum/production.mdwn +++ b/TeleMetrum/production.mdwn @@ -12,8 +12,6 @@ ground. R17 replaced with short circuit, R18 removed. Installed in Bdale's Vertical Assault. First unit to be flown on 19 April 2009, on a Cesaroni J335. -Moved to Horizon rebuild. - ## sn 2 ## Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory @@ -28,7 +26,7 @@ ascent was pretty but the rocket failed to deploy and lawn-darted. The battery and screw terminal block connectors got more or less torn off, but the rest of the board survived and good data was recovered from the flight. -In Bdale's possession for repair. +Repaired by Bdale, sent back to Keith on 7 July 2009. ## sn 3 ## @@ -41,6 +39,8 @@ flown there. Pulled and given to Keith to take home from Mayhem. +Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not recovered. + ## sn 4 ## Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 @@ -54,6 +54,8 @@ Installed in Robert's Lil Nuke. Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial connector for use as TeleDongle or for TeleTerra prototype. +Bdale's TeleDongle. + ## sn 6 ## Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle. |
