-rw-r--r--AltOS/launch-sites.txt1
-rw-r--r--TeleScience/index.mdwn8
2 files changed, 7 insertions, 2 deletions
diff --git a/AltOS/launch-sites.txt b/AltOS/launch-sites.txt
index 91561c9..6a7e7b4 100644
--- a/AltOS/launch-sites.txt
+++ b/AltOS/launch-sites.txt
@@ -16,6 +16,7 @@ OROC Brothers:43.79949786336483:-120.6485810681392:http://www.oregonrocketry.com
OROC Sheridan:45.044176:-123.314323:http://www.oregonrocketry.com/
OROC Wilsonville:45.297186:-122.759067:http://www.oregonrocketry.com/
QRS Cedar Grove:-27.8512283:152.9624000:http://qldrocketry.com/
+Rainbow Valley:33.24:-112.399166667:
SCORE Hudson Ranch:38.155602777777778:-104.809119444444444:http://scronline.net/
TRAAU Serpentine:-36.4823466:144.0180150:http://traau.com/
Tripoli Colorado Hartsel:39.009247:-105.702338:http://tripolicolorado.org/
diff --git a/TeleScience/index.mdwn b/TeleScience/index.mdwn
index 1e25ee1..d435a60 100644
--- a/TeleScience/index.mdwn
+++ b/TeleScience/index.mdwn
@@ -63,9 +63,13 @@ but no prototypes have been built yet.
## Future Plans ##
-3 prototypes have been built, of which 2 are installed in
+6 prototypes have been built, of which 2 were installed in
[2YikStik](http://www.gag.com/rockets/airframes/2YikStik/)
-which we hope to fly at LDRS 30 in early September 2011.
+and flown at LDRS 30 in early September 2011. Unfortunately, we experienced a
+mechanical failure in the airframe before going fast enough to get exciting
+data, but post-flight analysis suggested the TeleScience boards were working
+fine up until "the incident". A replacement airframe is under construction
+that we hope to fly at NCR's 2012 edition of Mile High Mayhem.
The thermistor conditioning circuits in the current design are very tightly