diff options
author | Bdale Garbee <bdale@gag.com> | 2010-02-25 16:18:27 -0700 |
---|---|---|
committer | Bdale Garbee <bdale@gag.com> | 2010-02-25 16:18:27 -0700 |
commit | fc5e80ea8fbc708774de65b1838da42cda97ba43 (patch) | |
tree | 6082005e5f163576463121de046b644fa0a9c2fb /production.mdwn | |
parent | 7713a716c266fbd7776d8d2df19a42bc41f9ef19 (diff) |
add a photo
Diffstat (limited to 'production.mdwn')
-rw-r--r-- | production.mdwn | 180 |
1 files changed, 180 insertions, 0 deletions
diff --git a/production.mdwn b/production.mdwn new file mode 100644 index 0000000..a14b60a --- /dev/null +++ b/production.mdwn @@ -0,0 +1,180 @@ +# TeleMetrum Units + +This page contains Bdale's notes about each unit of [TeleMetrum](..) +assembled to date. + +## sn 1 ## + +Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory +chip select, R14 and R15 loaded with 56k, 10k tacked from each to +ground. R17 replaced with short circuit, R18 removed. + +Installed in Bdale's Vertical Assault. First unit to be flown on +2009.04.19, on a Cesaroni J335. + +Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on +2009.07.18 with a MAWD as backup. The first dual-deploy flight with a TM +board in control of ejection charges! + +## sn 2 ## + +Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory +chip select, R14 and R15 loaded with 56k, 10k tacked from each to +ground. + +Delivered to Keith Packard for firmware development and use. Flown twice +on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors. + +Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload. The +ascent was pretty but the rocket failed to deploy and lawn-darted. The battery +and screw terminal block connectors got more or less torn off, but the rest +of the board survived and good data was recovered from the flight. + +Repaired by Bdale, sent back to Keith on 7 July 2009. Keith reported the +baro sensor as flakey, it was replaced in October 2009 prior to +NCR Octoberfest. + +## sn 3 ## + +Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never +flown there. + +Pulled and given to Keith to take home from Mayhem. + +Lost in Keith's Nike which was lost for a while after an apparently nominal +flight in June 2009 at Brothers, Oregon. Rocket was later found and this unit +is reportedly still in good condition. + +## sn 4 ## + +Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Installed in Robert's Lil Nuke. + +Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and +both it and the electronics sled came out at apogee and were not recovered. + +## sn 5 ## + +Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial +connector for use as TeleDongle or for TeleTerra prototype. + +Bdale's TeleDongle. + +Keith added acrylic LED light pipes and a LiPo for use in RDF after flight. + +## sn 6 ## + +Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle. + +Keith's TeleDongle. + +Keith added acrylic LED light pipes and a LiPo for use in RDF after flight. + +## sn 7 ## + +Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Pulled from Vertical Assault (never flew there) and taken to Keith in Japan +in October 2009 as replacement. + +## sn 8 ## + +Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Delivered to Keith in early November 2009. + +## sn 9 ## + +Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Installed in Bdale's Trick-o-Treat 98mm airframe. + +## sn 10 ## + +Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Installed in Robert's Lil Nuke. + +## sn 11 ## + +Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. Accelerometer loaded is MMA2204EG 100G unit! + +In G-Spot, this accelerometer recorded 52.8 gee acceleration on a +Cesaroni pro29 H399 reload at NCR Oktoberfest 2009! + +Beeper failed after a hard landing, replaced 2010.02.06. + +## sn 12 ## + +Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. Accelerometer loaded is MMA2204EG 100G unit! + +## sn 13 ## + +Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +Modified 2009.11.20 to: + +* use TC1055-3.3VCT713 100ma regulator proposed for v0.2 +* route 3.3V instead of v_lipo to the serial connector for SkyTraq GPS +* use v_lipo for pyro voltage instead of 5V with 1000uF capacitor +* added 100uF 1206 capacitor on 3.3V rail + +In this configuration, flew two textbook perfect flights on 2009.11.21 at +Hudson Ranch in Trick-O-Treat on J motors. + +## sn 14 ## + +Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +## sn 15 ## + +Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle. + +## sn 16 ## + +Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle. + +## sn 51 ## + +Full load of v0.2 PCB on 2010.01.09, with 100g accel and screw terminals. + +Installed in G-Spot on 2010.02.06. + +## sn 52 ## + +Full load of v0.2 PCB on 2010.01.09, with 50g accel and Tyco header. + +Went home with Keith from LCA 2010 in Wellington. + +## sn 53 ## + +Full load of v0.2 PCB on 2010.01.09, with 40g accel and screw terminals. + +## sn 100-207 ## + +First production run of 108 pieces of TeleDongle v0.2 by +[Advanced Circuits](http://4pcb.com), received 2010.02.25. + |